Power Stations Contracting & Repairing
Mainland License — Compare Across 3 UAE Emirates
Cheapest from
AED 1,000
Abu Dhabi
3 emirates available
Government Fee Comparison
ADDED — Per-activity fee
AED 1,000
DED fee: AED 1000
Base AED 8,000 + 5% rent
AED 9,500
30K rent
AED 10,500
50K rent
AED 12,000
80K rent
SEDD — Per-license (quote required)
Approvals: Sharjah Municipality - Technical Section
Quote required
Fees calculated per-license based on license type, legal form, and activities. C
Want the exact total cost for your setup?
A setup partner can give you a complete breakdown including office, visa, and approval fees.
About This Activity
Includes firms specialized in the construction of electric power plants to generate energy from different sources, including the execution of civil works and mechanical works, such as installing the machinery, generators and other necessary equipment, it also involves the constructing power boosting sub-stations, distribution centers and other facilities related to energy network and distribution.
Our Analysis
Power station contracting and repair in Abu Dhabi: AED 1,000. Dubai: AED 8,000 minimum. Same pattern — Abu Dhabi's DED fee is a fraction of Dubai's, and for power generation work, Abu Dhabi is where the action is.
The UAE's power generation capacity exceeds 30 GW. DEWA plants in Jebel Ali, EWEC stations across Abu Dhabi, and the Barakah nuclear plant all need construction, maintenance, and expansion contractors. The clean energy transition adds solar, green hydrogen, and battery storage projects.
Abu Dhabi dominates power generation. EWEC (Emirates Water and Electricity Company) operates the bulk of the UAE's generation fleet. ADNOC's cogeneration plants, Masdar's renewable projects, and Nawah's nuclear operations all sit in the capital emirate.
Dubai's Hassyan clean coal plant (now gas), DEWA's solar installations, and distributed generation projects provide a secondary market.
This is EPC-grade work. Engineering, procurement, and construction firms competing for power contracts need multi-million dirham bonding capacity. The AED 1,000 DED license fee is irrelevant compared to bid bonds.
100% foreign ownership. No local sponsor. EWEC, DEWA, and ADNOC vendor registration are the real entry barriers.
Abu Dhabi at AED 1,000 — the undisputed choice for power generation contracting.
For energy equipment trading in free zones, compare at FreeZoneCompare.com.
Prices from official government portals, verified May 2026.
Considering a free zone instead?
Compare free zone packages for similar activities at our sister site.
Related Activities in Construction & Contracting
Frequently Asked Questions
How much does a Power Stations Contracting & Repairing license cost in Abu Dhabi?
The government DED fee for a Power Stations Contracting & Repairing license in Abu Dhabi is AED 1,000. This is the cheapest among the 3 emirates where this activity is available. Additional costs may include office rent, visa fees, and external approval charges.
Which UAE emirate is cheapest for a Power Stations Contracting & Repairing license?
Abu Dhabi offers the lowest government fee at AED 1,000. However, total setup costs also depend on office rent, visa requirements, and any external approvals needed for this activity.
Can a foreigner own 100% of a Power Stations Contracting & Repairing business in the UAE?
Yes. Since the 2021 Commercial Companies Law reforms, most mainland business activities — including Power Stations Contracting & Repairing — allow 100% foreign ownership across all UAE emirates. A local sponsor or service agent is no longer required for most activities.
What approvals are needed for a Power Stations Contracting & Repairing license?
Beyond the DED license, you may need approval from: Contracting and building works (Dubai), Sharjah Municipality - Technical Section (Sharjah). Requirements vary by emirate and specific business scope.
How much does a Power Stations Contracting & Repairing license cost in Dubai?
Dubai uses a formula-based fee: approximately AED 8,000 base fee plus 5% of your annual office rent. For example, with AED 50,000 annual rent, expect roughly AED 10,500 in government fees. Dubai also offers an Instant License at AED 8,000 flat (virtual location) and budget SME/Intelaq licenses at AED 1,070.
Is Power Stations Contracting & Repairing available as a mainland license in all UAE emirates?
Power Stations Contracting & Repairing is available for mainland licensing in 3 emirates: Dubai, Abu Dhabi, Sharjah. Each emirate has its own DED with independent fee structures and requirements. Use MainlandCompare.com to compare fees across all available emirates.
What type of license is Power Stations Contracting & Repairing in the UAE?
Power Stations Contracting & Repairing falls under the Commercial license category in the UAE. Commercial licenses cover trading, import/export, and retail activities.
Is it cheaper to get a Power Stations Contracting & Repairing license in Abu Dhabi or Dubai?
Abu Dhabi is significantly cheaper at AED 1,000 versus Dubai's estimated AED 10,500 (at AED 50,000 rent). However, Dubai offers a larger market with 3.6 million residents and 16 million annual tourists.
How long does it take to get a Power Stations Contracting & Repairing mainland license?
Setup time varies by emirate: Dubai offers same-day approval with the Instant License (AED 8,000), or 1-3 working days for a Normal License. Abu Dhabi takes 2-5 working days. Sharjah and Ajman take 1-5 working days. Additional time may be needed for external approvals.
Ready to get started with Power Stations Contracting & Repairing?
Get a free, no-obligation quote from a vetted mainland setup partner.
Reply within 2 hours · No commitment
مقاولات إنشاء محطات الطاقة الكهربائية وإصلاحها